I didn’t start planning what I’m going to do each week till around week 3 and during that week I listed everything I needed to do on Trello and started hammering out each one of them, For DST (Digital Storytelling) I made my story and started the storyboard this week.
Week 4 was hard for me to do much work because during the middle of the week I got heavily Ill and was barely able to think let alone move around and do much work.
Even during Week 5, I was still very I’ll however I had planned the week before to catch up during the enhancement week (week 7).
Weeks 6 & 7 are crucial for DST I put all my eggs in one basket and worked hard on making things for the DST assignment making every WordPress post I would need during these two weeks.
I was planning to make a draft of a script for my animation to get a better understanding of the dialog that will happen throughout however I want to keep that for a later date so I have more time to refine the script alongside the animation as I may change lines right up until the deadline which means the little script I have at the moment in my story overview Is what I will run with for now.